Standard & Detailed Office Handover Documents and Process

On this page

An office handover should clearly record the condition, scope, assets, and documents being transferred before the company proceeds with the next steps. The handover minutes and supporting documents help the parties note discrepancies, identify items requiring action, and establish a reference record for the period of occupancy.

1. What is an office handover?

An office handover is the transfer of a workspace from the landlord or developer to the tenant or fit-out contractor, accompanied by minutes documenting the condition, assets, technical systems, and responsibilities of each party. The minutes provide an important reference for determining the lease commencement date, addressing damage, carrying out fit-out work, and returning the premises.

2. Types of office handover

Office premises are generally handed over in one of three conditions: bare shell, warm shell, or fully fitted. The scope of completion depends on the contract, handover standards, and technical conditions of each building.

CriteriaBare shell handoverWarm shell handoverFully fitted handover
ConditionPrimarily includes the structural elements and common infrastructure, with few finishing items.Includes some finishing items and basic technical systems.Includes many architectural, technical, or interior fit-out items.
Existing itemsStructure, perimeter walls, and some utility connection points.May include flooring, ceilings, lighting, fire protection, and air conditioning.May include partitions, electrical and network systems, air conditioning, furniture, and functional areas.
Work to be carried outComplete the architectural finishes, technical systems, and interiors.Add space planning, technical systems, and furniture to meet business needs.Retain, adjust, or renovate existing items.
Time to become operationalLonger; typically several weeks to a few months, depending on the project scale.Relatively quick, as only interior fit-out and additional systems are needed.Quick; the office may be ready for use after equipment setup.
Items to confirm at handoverThe scope provided by the building and the work the company must complete.Completed items and any remaining work.Existing condition, assets, and whether existing items can continue to be used.

3. When is an office handover needed?

A handover usually takes place when a company takes possession of a newly leased office, transfers the premises to a design and build contractor, or returns the premises after renovation or at the end of the lease. In each case, the parties should confirm the scope and condition relevant to the purpose of the transfer.

3.1. Handover when taking possession of a newly leased office

The company takes possession from the landlord or property management unit at the time agreed in the contract or an addendum. The parties should confirm the premises included in the handover, their condition, the assets, accompanying documents, and any outstanding items.

The lease effective date and the handover date may differ. The transfer date should follow the agreement between the parties.

3.2. Handover to a design and build contractor

Before design and construction begin, the company should provide the contractor with the available information about the premises. This may include existing drawings, technical conditions, building regulations, and discrepancies recorded during the initial handover.

An existing condition survey is a separate step to verify the measurements and other information needed for design and construction. The handover focuses on the scope, documents, and condition of the premises transferred to the contractor.

3.3. Handover when returning an office

At the end of the lease, the company returns the premises to the landlord under the agreed conditions. The parties should inspect the condition, assets, and any items requiring attention before confirming the return. Handover documents created when the office was first received help compare its initial condition with its condition at the end of the lease.

4. Download an office handover minutes template

An office handover minutes template should clearly state the scope of the handover, assets, condition, discrepancies, accompanying documents, and confirmation by the parties. Companies should adapt the template to the specific transaction, especially the signatories, scope of responsibility, repair requirements, and supporting technical documents.

5. What documents are included in an office handover?

A handover file includes the handover minutes and documents used to confirm the scope, condition, assets, and technical conditions of the premises. The specific documents depend on the contract, the condition of the space, and each building’s requirements.

5.1. Essential documents

Whether each document is required depends on the contract and the rules applicable to the transaction. A handover file typically includes:

  • Office handover minutes: Names of the parties, handover date and time, scope, and signatories.
  • Floor plan or location plan: The floor, area, and boundaries of the premises being handed over.
  • Asset and equipment inventory: The quantities, locations, and condition of any assets included.
  • Condition record: The observed condition of floors, walls, ceilings, doors, glazing, and related items.
  • Electricity and water meter readings: Meter readings and locations, if they are within the handover scope.
  • Photos or videos: Overall views of the premises and any damaged or discrepant areas.

Photos, condition records, and asset inventories should be clearly labeled so they can be matched to the relevant locations or items in the minutes.

5.2. Technical and operating documents

Technical documents provide information about existing systems and conditions to consider before design and construction. Depending on the scope of the premises, these may include:

  • Mechanical, electrical, and plumbing (MEP) drawings: Electrical, lighting, water supply and drainage, air conditioning, ventilation, and connection points.
  • Fire protection and fire safety documents: Drawings, equipment locations, and related information provided by the building.
  • Access control information: Cards, locks, controlled areas, and applicable usage rules.
  • Building fit-out guidelines: Rules for working hours, deliveries, freight elevators, waste collection, and temporary construction utilities.
  • Operating or maintenance documents: Materials for any equipment, electrical panels, air conditioning, or dedicated systems included in the handover.

Technical documents establish what information was transferred when the premises were received. Whether the systems meet applicable standards should be assessed within the relevant inspection scope and technical requirements.

5.3. Legal documents to check

Legal documents help confirm the basis for the handover, the signatories, and the agreed conditions. Depending on the project requirements, the company should check:

  • Lease agreement and addenda: Confirm the premises covered, handover date, responsibilities, and return conditions.
  • Power of attorney: Required when a signatory is acting on behalf of another party.
  • Documents establishing the right to lease or use the premises: Check these when the basis of the transaction needs to be verified.
  • Building-related documents: Review these when the permitted use or renovation scope requires verification.
  • Company legal information: Used to confirm the contracting entity and its representative when required by the contract or building.

Legal documents that need to be checked do not automatically have to be attached to the handover minutes. Which documents are retained in the file depends on the contract, the building’s procedures, and the requirements of the transaction.

6. Office handover checklist

An office handover checklist helps a company review the information to confirm when taking possession. Whether the premises meet technical standards should be assessed based on the relevant documents and technical inspection.

Inspection categoryInformation to recordReference documents
Handover documents and scopeFloor, area, boundaries, area stated in the documents, and materials provided.Contract, addenda, floor plan
Floors, walls, ceilings, doors, and glazingObserved finishing condition, damage, or discrepancies.Photos, videos, location plan
Electrical and lighting systemsEquipment, meters, power supply points, and condition recorded at handover.Drawings, photos, meter readings
Air conditioning and ventilationEquipment, connection points, connection locations, and technical documents provided.MEP drawings, technical documents
Fire protection and fire safetyEquipment locations and fire protection documents within the handover scope.Drawings, fire protection documents, condition photos
Water supply and drainageSupply and drainage points, equipment, and any visible signs of leakage.MEP drawings, condition photos
Delivery and fit-out conditionsFreight elevators, delivery routes, working hours, staging areas, and related conditions.Building fit-out guidelines
Assets and access rightsKeys, access cards, remote controls, equipment, and accompanying assets.Asset inventory, handover minutes

7. Office handover process

The office handover process has six steps, from preparing documents to signing and filing them. At each step, the parties should clearly confirm the scope, condition, and information being transferred so they have a reference for future checks.

7.1. Prepare documents and schedule the handover

Before the handover date, the company should review the contract, addenda, existing drawings, and the building’s fit-out guidelines. The participants should be selected based on what needs to be checked. A design and build contractor may attend if technical matters or the scope of work require support.

The parties should agree on the timing, scope, and expected condition of the premises at handover. Fit-out conditions, deliveries, freight elevator use, and related fees should also be checked against the contract and the building’s rules.

7.2. Inspect the existing condition

The parties should inspect the premises in person and compare them with the handover documents. The purpose is to record the condition at the time of transfer and identify discrepancies that need clarification.

The inspection typically covers:

  • Floors, ceilings, walls, doors, glazing, and observable finishing conditions.
  • Existing electrical, air conditioning, water supply and drainage systems, and technical connection points.
  • Fire protection equipment, evacuation routes, and access control systems within the handover scope.
  • Assets and equipment handed over with the premises.

Items requiring measurements or technical assessment should be checked separately according to the requirements of each item. The handover minutes should focus on recording the condition and the matters confirmed by the parties at the time of transfer.

7.3. Prepare the handover minutes

The minutes should identify the parties, the contract serving as the basis for the handover, the date and time, and the scope. The condition of the premises, assets, and outstanding items should be described clearly by location.

Photos, videos, plans, and asset inventories may be attached to the minutes. Each photo or note should be clearly linked to the relevant location or item for easier reference.

7.4. Hand over keys, access cards, and meter readings

Keys, access cards, parking cards, remote controls, and access devices should be counted and recorded at handover. If there are different card types or controlled areas, the minutes should specify where each can be used.

For separately metered electricity or water, the parties should record the readings at the time of transfer and retain photos for reference. Costs incurred after handover are determined under the contract and the building’s charging arrangements.

7.5. Record defects and corrective actions

For each outstanding item, record its location, condition, and the work required. Once responsibility has been established, the minutes or an addendum should state the responsible party, scope of work, and agreed deadline so the item can be tracked after handover.

Repair responsibility should be determined based on the cause, handover scope, contract, and confirmation between the parties. The handover minutes record the condition at the time of transfer; they do not replace inspections or technical acceptance of items that require separate assessment.

7.6. Sign the minutes and file the documents

The signatories should have appropriate authority or a valid power of attorney. Company seals should be applied in accordance with applicable rules, the parties’ agreement, and company policy.

After signing, the company should file the minutes together with the addenda, photos, drawings, and related documents. The file should be easy to retrieve during design and construction and when comparing the premises’ condition at the time of return.

8. Notes for preparing office handover minutes

The minutes should contain enough information for the parties to verify the condition and responsibilities after handover. Companies should focus on how items are described, the supporting evidence, responsibility for corrective work, fit-out conditions, and documents to retain.

8.1. Record the condition of each handed-over item

Describe each item by location, condition, and any discrepancy observed at handover. Where actual measurements or readings are available, include them along with the reference documents. General descriptions such as “in good condition” or “operating normally” may not provide enough detail for a later inspection.

8.2. Attach photos or videos to reduce the risk of later disputes

Photos should show the overall premises and any areas with damage, discrepancies, or items requiring action. Important areas and items such as walls, ceilings, glazing, meters, technical cabinets, and handed-over assets should be photographed clearly enough to identify them.

Photos and videos should be filed with the minutes or labeled so they can be matched to the relevant items. The records may be kept in paper or electronic form, as agreed and managed by the parties.

8.3. Clarify responsibility for repairs and completion work

The minutes should distinguish completed items, outstanding items, and work assigned to a responsible party. Costs, corrective work, and deadlines should follow the contract or the parties’ agreement. If there is not enough information to determine the cause, the minutes should state what needs further inspection before responsibility is assigned.

8.4. Check fit-out, delivery, and after-hours working conditions

Building rules may affect the timing and organization of fit-out work. The company should review the building’s fit-out guidelines to confirm working hours, freight elevator use, delivery routes, staging areas, temporary construction utilities, and conditions for after-hours work.

Any related fees and procedures should be confirmed under the rules of the building where the premises are being handed over and the arrangements applicable to the space.

8.5. Keep records for comparison when returning the premises

The minutes, photos, and addenda prepared when taking possession should be retained throughout the lease so they can be used to compare the condition at the time of return. The required reinstatement scope should follow the contract, addenda, and agreements with the landlord.

9. Office handover vs. premises return

An office handover takes place when a company takes possession of the premises, while a premises return occurs at the end of the lease. Both involve recording the condition, but they differ in purpose, timing, and reference documents.

CriteriaOffice handoverPremises return
TimingWhen the company takes possession under the lease agreement.When the company ends the lease and returns the premises.
PurposeTo confirm the scope and condition at the time of possession.To confirm the condition before completing the return.
Reference documentsContract, addenda, handover documents, and actual condition.Contract, return conditions, and initial handover records.
Items to confirmCondition, assets, documents, and items being handed over.Condition, assets, and items requiring attention before return.
Confirmation documentsHandover minutes and accompanying addenda.Return minutes and related reference documents.

An office handover should clearly document the condition, assets, documents, and outstanding items at the time of transfer. Complete handover records give the company a reference for office design and construction, tracking items that need attention, and comparing the condition of the premises when they are returned.

10. Frequently asked questions (FAQ)

10.1. Is it mandatory to prepare handover minutes?

There is no single standard handover minutes template that is mandatory for every office lease. Whether minutes should be prepared depends on the contract and the parties’ agreement. They also help clearly record the date, scope, and condition of the premises at handover.

10.2. What should the handover minutes include?

The minutes should include the parties’ details, handover date, scope of the premises, condition, accompanying assets, and outstanding items. Photos, an asset inventory, or related documents may be attached to support future reference.

10.3. What should be inspected before signing?

The company should inspect the premises’ scope and condition, the systems being handed over, the assets, and accompanying documents. Items requiring separate measurements or technical assessments should be checked as appropriate before confirmation.

10.4. Should the fit-out contractor attend the handover?

A contractor may attend when the company needs support checking matters related to design or construction. Depending on the agreed scope of work, the contractor can help compare the premises’ condition with the available documents and identify the information needed for the next stage.

10.5. What should we do if we find defects when taking possession?

Record each defect or discrepancy, its location, condition, and supporting evidence in the minutes or an addendum. Once responsibility has been established, the documents should specify who will address it, the corrective work, and the agreed deadline.