Discover your workspace identity
Insights

Office Ventilation Systems: Standards and How to Choose

On this page

An office ventilation system should suit the space’s function, occupancy, and building infrastructure. Before implementation, businesses should define outdoor air requirements, pollutant exhaust needs, the scope of work, and pre-handover inspection requirements.

1. What Are Office Ventilation and Fresh Air Supply Systems?

Office ventilation and fresh air supply systems exchange indoor air with outdoor air. Fresh air refers to outdoor air, while supply air may include fresh air and treated return air. Return air is collected and recirculated through the system, while exhaust air is discharged outdoors. The ventilation system works with the air conditioning system to maintain the workplace environment.

2. The Role of Office Ventilation Systems

Ventilation dilutes and removes pollutants generated indoors. Its effectiveness depends on outdoor air quality, how air is distributed, and how indoor pollution sources are controlled. Air filtration, cleaning, and suitable material selection also help maintain indoor air quality.

Air supply and exhaust requirements should be determined for each area according to its function:

  • Work areas: Provide air appropriate to the number of occupants and indoor pollution sources.
  • Meeting rooms: Determine air supply requirements based on simultaneous occupancy and periods of peak use.
  • Support areas and pantries: Control odors, humidity, and airflow direction according to the space’s function.

Businesses should consider reports of stuffiness, fatigue, or difficulty concentrating alongside temperature, humidity, odors, and working conditions. CO₂ concentration can help assess ventilation when it is measured and recorded correctly. Indoor air quality assessments should combine measured parameters with an assessment of pollution sources.

3. Standards Applicable to Office Ventilation Systems

The applicable standards should be identified according to the project’s scope. The design team should confirm the applicable regulatory requirements, selected standards, building requirements, and project design documentation before finalizing the ventilation solution.

4. Common Types of Office Ventilation Systems

The system type should be selected based on the building’s infrastructure and each area’s needs.

4.1. Natural and Hybrid Ventilation

Natural ventilation uses wind and temperature differences to exchange air through windows or other openings. Its suitability depends on the building’s architecture, weather, noise levels, and outdoor air quality.

Hybrid ventilation combines natural and mechanical ventilation. Offices with openable windows still need an assessment of air exchange when windows are closed or occupancy is high. System operation must be coordinated with the air conditioning system and comply with building requirements.

4.2. Supply Fan Ventilation

A supply fan brings outdoor air into the office through an appropriate filter and duct route. The design must identify how air will leave the room. A supply airflow rate that exceeds the exhaust rate may increase room pressure, depending on the room’s airtightness and available air paths.

The supply air plan should account for outdoor air conditions and the air conditioning system’s treatment load. If air is expected to exit through door gaps, the air path should be checked to reduce the risk of uneven distribution between rooms.

4.3. Exhaust Fan Ventilation

An exhaust fan removes indoor air, so a source of make-up air must also be provided. The make-up air path should be identified to prevent odors or air from polluted areas from being drawn into work areas.

Exhaust ventilation is commonly considered for restrooms, food and beverage preparation areas, and spaces where odors are generated. When it is used for enclosed work areas, the design team should check:

  • The source of make-up air.
  • The filtration capacity of the make-up air system.
  • How air is distributed to occupants.

4.4. Combined Supply and Exhaust Ventilation

This system uses separate supply and exhaust routes to control air exchange. Supply and exhaust airflow rates are adjusted to suit each area. Supply outlets, exhaust grilles, and air transfer paths should be coordinated with the floor plan.

Supply and exhaust fans should be balanced, and air paths should be checked to achieve the intended pressure differences between rooms. Balancing helps prevent some rooms from receiving excessive airflow while others lack fresh air.

4.5. Heat Recovery Ventilation (HRV) and Energy Recovery Ventilation (ERV)

Energy recovery equipment transfers heat between supply and exhaust air streams to reduce the load of treating outdoor air. HRV recovers heat related to temperature differences. ERV also transfers moisture between air streams.

The choice between HRV and ERV should account for climate, airflow rate, operating schedule, and equipment characteristics. Energy recovery performance also depends on fan power consumption, duct resistance, and maintenance. Businesses should assess total operating costs before selecting an energy recovery configuration.

5. Main Components of an Office Ventilation System

Components are selected according to the system design. The system may use a duct network to distribute air to several rooms or direct-mounted equipment to serve a specific area.

ComponentFunction and technical considerations
Supply fans, exhaust fans, and air treatment equipmentMove and treat air according to the system configuration. Check airflow, pressure, power consumption, and noise.
Rigid ductsCarry air along the designed route. Check cross-sectional area, joints, supports, and insulation where required.
Flexible ductsCarry air and connect to the designed locations. Check length, bends, sagging, and any crushing or constriction.
Air grilles and balancing dampersGrilles distribute or collect air. Dampers are used to balance airflow in each branch.
Air filtersCapture pollutants according to the filter’s capacity. Check filter class, resistance, and access for replacement.
Sound attenuators and anti-vibration accessoriesReduce noise and vibration transmitted through equipment and ductwork.
Sensors and controllersSensors monitor system parameters. Controllers adjust operation according to the design.
Safety equipmentMeet safety requirements in the design documentation, including fire or smoke dampers where required.

Air routes may use rectangular sheet-metal ducts, round ducts, or flexible ducts. Duct selection should account for routing, pressure loss, and installation conditions. For direct-mounted equipment, check the outdoor air intake, exhaust route, and actual service area.

6. Determining Airflow Rates and Selecting Ventilation Equipment

The design team should determine fresh air requirements for each space before calculating the system’s total demand. After calculating fresh air requirements, the team should check the building’s air supply capacity and select equipment compatible with the duct system.

6.1. Collecting Occupancy, Space Use, and Existing Condition Data

Usage requirements and installation conditions should be clarified before calculating airflow rates:

  • The number of people present at the same time in work areas and each meeting room.
  • Area, function, usage schedule, and sources of odors or humidity.
  • Natural ventilation potential and airtightness of each room.
  • Existing fresh air sources, connection points, and the building’s air supply conditions.
  • Equipment locations, duct routes, power supply, and maintenance access.

For hybrid work arrangements and visiting meeting attendees, the number of people using a space simultaneously should be established. If a room’s function changes or seating capacity increases, the design team should update the data before reassessing fresh air requirements.

6.2. Determining Fresh Air Requirements for Each Space

Under the per-person calculation method, the fresh air volume is the number of simultaneous occupants multiplied by the air supply rate per person. The applicable rate should be selected based on the room type and the conditions specified in the relevant standard.

For administrative and office buildings, Table E.1 of TCVN 5687:2024 specifies:

  • Work rooms: 25 m³/h/person.
  • Seminar rooms, council rooms, and boardrooms: 30 m³/h/person.

Example: A work room is used by 50 people at the same time, with an air supply rate of 25 m³/h/person. The per-person fresh air volume is Q = 50 × 25 = 1,250 m³/h.

The table’s values should be applied in accordance with its conditions and notes. The calculation should be checked against the space’s function, pollution sources, and other design requirements. Fresh air volume may differ from the total supply airflow into a room when the system uses return air.

6.3. Selecting Equipment Based on Airflow and Operating Conditions

Equipment should deliver the required airflow at the system’s operating pressure. The design team should compare the fan performance curve with the resistance of the ducts, filters, dampers, and grilles. The maximum airflow stated for a unit may differ from the actual airflow after installation.

In addition to airflow and pressure, equipment selection should account for operating, installation, and maintenance conditions:

  • Noise, vibration, and equipment location.
  • Power consumption, adjustability, and operating schedule.
  • Filter characteristics and the ability to maintain airflow as dust accumulates.
  • The ability to treat temperature and humidity or recover energy.
  • Installation space and access for cleaning, filter replacement, and repairs.

When coordinating fresh air supply with the office air conditioning system, check the outdoor air treatment load and indoor comfort conditions.

7. Coordinating Ventilation Systems with the Building and Interior Design

The scope of work for the ventilation system should be clarified before finalizing the office design and construction plan. Office systems should align with the air supply provided by the building and actual usage requirements.

7.1. Confirming the Fresh Air Source and Responsibilities with Building Management

Businesses should clarify the following information about the air supply and system management responsibilities with building management:

  • Air supply capacity and connection points to the shared system.
  • Air supply hours and the building’s system usage conditions.
  • System information in the handover documentation and any additional measurements or inspections required.
  • Each party’s responsibilities for investment, operation, maintenance, and troubleshooting.

If additional fans are planned or the supply or exhaust routes will be modified, the design team should assess the impact on the building’s systems before implementation.

7.2. Coordinating Duct Routes and Air Grilles with the Floor Plan and Ceiling

The ventilation layout should be reviewed against the office MEP drawings, partition locations, lights, and ceiling-mounted equipment. Duct routes should allow enough installation space and leave access for maintenance.

If additional enclosed rooms are created, the design team should recheck the supply, exhaust, and air transfer routes. Air grille locations should be coordinated with seating and furniture to avoid blocking airflow or causing discomfort for staff.

7.3. Coordinating with Air Conditioning, Electrical Controls, and Fire Protection

The technical documentation should show how the ventilation system is coordinated with each discipline:

  • Air conditioning: Check the outdoor air treatment load and how air is supplied to the system or individual rooms.
  • Electrical controls: Agree on power supply, operating schedules, sensors, and control modes.
  • Fire protection: Review duct penetrations through structural elements, safety equipment, and control requirements during an incident.

Requirements for fire dampers, smoke dampers, and interlocks between equipment should follow the project’s applicable fire protection documentation. During design coordination, distinguish between everyday ventilation and smoke control systems.

8. Inspecting the Ventilation System Before Handover

Pre-handover inspections should cover both installation and operating performance. Before the inspection, the parties should agree on criteria, measurement conditions, and documentation procedures.

8.1. Reviewing Documentation and Inspecting the Installation

The inspection team should use approved drawings and equipment documentation. Any changes made during construction should be recorded so they can be compared against the installed conditions.

ItemReference for comparisonResults to record
Equipment and filtersEquipment documentation and installation instructionsCorrect type and location, and adequate maintenance access
Ducts and accessoriesDrawings and technical instructionsRoutes, joints, supports, insulation, and locations requiring attention
Air grilles and dampersLayout and air distribution diagramLocations, installation condition, and adjustability
Air intake and exhaustApproved planLocations and risk of interference between air streams
Electrical, controls, and safetyRelated electrical and control documentationConnections, operating modes, and outstanding issues

For each item, record whether it passes or has outstanding issues, who is responsible for corrective action, and the results of any reinspection. Compile the data with the office interior design documentation and handover documents in accordance with the contract scope.

8.2. Measuring Airflow and Balancing Air Distribution

Airflow should be measured at appropriate locations and compared with the design. The inspection report should record measurement points, measuring equipment, operating mode, and system condition during the inspection. Filters, dampers, and room doors should be in the states specified in the measurement plan.

If air distribution does not meet requirements, the technical team should investigate the cause, balance the system, and measure again. Any deviation should be assessed against the criteria selected for the project. CO₂ readings may be used as supplementary data based on the inspection objectives and actual usage conditions.

8.3. Testing Operation and Handing Over Documentation

Operational testing should check fan direction, noise, vibration, and whether the system responds to its control modes. Building management or the responsible service provider should participate in testing functions connected to the building’s systems.

Handover documents should include as-built drawings, measurement results, equipment information, and operating and maintenance instructions within the scope of work. Outstanding issues should be recorded along with their resolution status and responsibility for reinspection.

9. Operating the System and Addressing Ventilation Issues

Operation should follow actual usage requirements and the configuration handed over. If occupancy, room layout, or working hours change, businesses should reassess whether the system can continue to serve the space adequately.

9.1. Monitoring Usage Conditions and Air Quality

Recording the affected area, when complaints occur, and the number of occupants can help narrow down the issue. Temperature, humidity, odors, and operating mode should be considered together.

When monitoring CO₂, check sensor location, accuracy, and calibration status. Readings should be recorded alongside occupancy and system operating hours. Air quality assessments may require additional parameters based on identified pollution sources.

9.2. Cleaning, Replacing Filters, and Maintaining Equipment

Cleaning and filter replacement schedules should follow equipment instructions, dust conditions, and actual usage. Dust buildup in filters can increase resistance and change airflow. Leaks, damaged seals, or air bypassing the filter should also be addressed.

Maintenance access should remain clear after furniture is installed. After replacing a filter, repairing a fan, or modifying ductwork, check the affected parameters before returning the system to its regular operating mode.

9.3. Investigating Stuffiness, Odors, or Noise

Before selecting a corrective measure, compare what is happening in the room with the system and potential sources.

SymptomWhat to check
Stuffiness in one roomOccupancy, air supply hours, airflow to the room, and air transfer route
Odors from a support areaOdor source, exhaust fan, make-up air route, and airflow direction
Weak airflow at a grilleFilter, balancing damper, duct condition, and fan operating mode
Noise or vibrationSource, connection points, anti-vibration accessories, and sound transmission path
Condensation or unusual moistureMoisture source, insulation, and temperature and humidity treatment capacity

Inspection results provide a basis for cleaning, balancing, repairs, or design changes. If the issue involves a shared system, businesses should coordinate with building management before changing equipment or operating modes.

Businesses should confirm the building’s air supply capacity and each room’s usage requirements before finalizing the ventilation plan. Design documentation, measurement results, and operating instructions help control quality at handover and provide a basis for system adjustments when the office changes.

10. Frequently Asked Questions (FAQ)

10.1. Does a Small Office with Few Occupants Need Mechanical Ventilation?

The choice depends on air exchange capacity, the space’s function, and usage conditions. Even a small office may need mechanical ventilation if it is enclosed or lacks an outdoor air intake. Spaces that can use natural ventilation should be assessed under actual operating conditions.

10.2. Does Fresh Air Supply Increase Air Conditioning Electricity Consumption?

Outdoor air supply can increase cooling and dehumidification loads. The increase depends on climate, airflow rate, and operating schedule. Energy recovery may reduce some of the treatment load, but the overall benefit should account for fan power, maintenance, and equipment characteristics.

10.3. Are HRV or ERV Systems Mandatory in Enclosed Offices?

Whether HRV or ERV installation is required depends on the project’s applicable requirements. Check the relevant codes, selected standards, design documentation, and building requirements. Airtightness is one factor in selecting a ventilation solution, along with technical conditions and operating objectives.

10.4. Can a HEPA Filter Be Added to an Existing System?

Check the fan’s capacity, filter resistance, installation dimensions, and system airtightness. If the system can accommodate the planned filtration configuration, the option can be considered. After the upgrade, airflow should be measured and operation checked to assess the actual impact.

10.5. How Should Fresh Air Supply Be Checked for After-Hours Work?

Businesses should confirm with building management whether the fresh air supply system operates during extended hours. If operation must be registered, the parties should agree on the schedule, service area, and costs under the building’s terms. The office system should also operate in line with occupancy hours.

Author

MKT Team

Contact Maison Interior

Tell us about
your office project

Share your floor plan, expected team size and requirements to start a conversation with Maison Interior.