Discover your workspace identity
Insights

A Guide to Selecting and Planning an Office Air Conditioning System

On this page

An office air conditioning system should be selected based on heat load, building infrastructure, and how each area is used. The right solution helps maintain a comfortable working environment and manage operating costs. Before finalizing equipment, businesses should clarify the system configuration, cooling capacity, and installation conditions.

1. Types of Office Air Conditioning Systems

Office air conditioning systems can be classified by system type and indoor unit type. The system determines how equipment is connected, how cooling is delivered, and how it is controlled. The indoor unit type affects installation location, airflow direction, and the appearance of the finished space.

1.1. Classification by Air Conditioning System

Common options include split systems, multi-split systems, variable refrigerant flow (VRF) systems, and chiller systems. The areas each system can serve depend on its configuration and equipment connection limits.

VRV is Daikin’s trade name for a system in the VRF category. Chiller systems may use fan coil units (FCUs) or air handling units (AHUs) as terminal equipment.

SystemBasic configurationOperation and zoningItems to check
Split systemOne outdoor unit connected to one indoor unitEach system operates independentlyOutdoor unit location, power supply, and piping route
Multi-split systemOne outdoor unit connected to multiple indoor unitsEach indoor unit can be controlled within the system’s limitsConnection combination and cooling capacity during simultaneous operation
VRF/VRV systemA group of outdoor units connected to multiple indoor units through refrigerant pipingControlled by room or group of unitsEquipment compatibility, piping length, and control configuration
Chiller systemA chiller supplies chilled water to air handling equipmentZoning through terminal equipment and controllersAvailable cooling capacity, water flow rate, and connection points

1.2. Classification by Indoor Unit Type

A system may use multiple compatible types of indoor units. Selection should take into account the interior layout, ceiling space, and access for equipment maintenance.

Indoor unit typeInstallation locationAir distribution characteristicsMaintenance considerations
Wall-mountedOn the wall, near the ceilingDelivers air from the unit’s mounted positionLeave space to open the cover and remove the filter
Ceiling cassetteUnit body concealed in the ceiling, with the panel exposed belowNumber of airflow directions varies by modelProvide access to remove the filter and reach technical components
Concealed ductedConcealed in the ceiling and connected to supply and return air grillesDistributes air through ductworkProvide access panels where maintenance work is required
Ceiling-suspendedMounted close to the underside of the ceilingDelivers air along the roomLeave working space around the unit
Floor-standingPlaced on the floor at the selected locationDelivers air from the unit into the roomAllow space for the unit and maintenance access

The cooling performance of each indoor unit type depends on its capacity and installation conditions. Room area should be assessed alongside floor plan shape, ceiling height, and heat sources.

2. How to Determine Office Air Conditioning Capacity

An air conditioning system’s cooling capacity is determined by the heat load it needs to handle under design conditions. In addition to floor area, the input data includes the number of occupants, equipment, and the office’s architectural features.

2.1. Collect Floor Plan and Heat Source Data

The design team needs information about the office space, heat sources, and usage schedule to calculate the cooling load for each area.

Data categoryInformation to collect
Space dimensionsArea, height, shape, and location of each room
Architectural featuresGlazing area, sun exposure, shading measures, and walls or roof exposed to the outdoor environment
OccupantsNumber of people present at the same time, activity level, and duration of occupancy
Equipment and lightingEquipment type, capacity, quantity, and operating schedule
Space usageWork areas, meeting rooms, equipment areas, and door-opening frequency
Operating hoursWorking hours, after-hours use, and separate operating requirements
Outdoor airSupply airflow and the approach to treating heat and humidity before air enters the room

For office renovations, the design team should also document the existing system’s cooling capacity and condition. The cooling load calculation should distinguish confirmed data from assumptions that still need verification.

2.2. Area-Based Estimates vs. Heat Load Calculations

An area-based estimate can provide an initial capacity allowance when floor plan information is limited. The estimate may change once sun exposure, occupant numbers, equipment, and the amount of outdoor air requiring treatment are confirmed. A heat load calculation uses specific data for each area to determine its cooling requirements.

Cooling capacity is commonly expressed in BTU/h or kW of cooling. Electrical input power is a separate specification used to assess power supply requirements and calculate energy consumption.

2.3. Select Capacity for Each Area

The capacity required for each area should be determined based on occupant density, equipment, and usage hours.

  • Work areas: Calculate based on the number of people present at the same time, equipment, and heat gain from the building envelope.
  • Meeting rooms: Consider the number of people gathered and each room’s usage schedule.
  • Areas with heat-generating equipment: Determine equipment heat loads and after-hours cooling requirements.

After calculating the load, the design team should compare it with the equipment’s capacity under the expected operating conditions. For building-provided systems, the team should confirm the available cooling capacity and the extent to which the system can be adjusted for each area.

3. Criteria for Selecting an Office Air Conditioning System

Once the required cooling capacity has been determined, businesses can compare options based on installation conditions, control requirements, and operating costs.

3.1. Existing Infrastructure and Building Requirements

The air conditioning system provided by the building determines the options a business can select or adjust. Before recommending a solution, the design team should check the power supply, equipment locations, connection points, and components that belong to the building’s shared systems.

Project documents should state the agreed design basis and building requirements. TCVN 5687:2024 is the standard for ventilation and air conditioning design requirements. The design team should determine whether and how it applies based on the project scope and related requirements.

3.2. Zoning and Operating Schedule Requirements

The control strategy should suit rooms used independently and the actual operating schedule. The following requirements should be clarified:

  • Areas that need independent air conditioning.
  • Controller locations.
  • Users’ authority to change settings.
  • The ability to operate areas separately when they are used after hours.

For leased office space, businesses should confirm the cooling schedule and usage registration requirements with the building management team.

3.3. Energy Efficiency and Noise

Businesses should compare the energy efficiency of equipment in the same category using the same evaluation basis. The Cooling Seasonal Performance Factor (CSPF) indicates cooling efficiency under the specified seasonal test conditions. Actual energy consumption also depends on cooling load, operating hours, settings, and installation quality.

Noise should be considered under the expected operating mode and at the occupants’ locations. When reviewing equipment documentation, businesses should check the measurement conditions and the type of acoustic rating reported.

3.4. Total Cost, Warranty, and Availability

Total cost should cover equipment, installation, and operation. Businesses should review the quotation scope alongside warranty and supply conditions.

  • Equipment, controllers, and included accessories.
  • Piping, insulation, power supply, suspension systems, and related finishing work.
  • Electricity costs, cleaning, maintenance, and replacement parts.
  • Warranty conditions, the service provider, and the availability of equipment and parts.

When comparing brands, businesses should select models that meet the same technical requirements. The warranty period should be reviewed alongside warranty coverage and the installer’s responsibilities.

See also: Common Office Fit-out Costs

4. Leading Air Conditioning Brands

After defining the system and technical requirements, businesses can review each brand’s equipment range. Products within the same brand may have different applications and configurations.

4.1. Daikin

Daikin offers SkyAir commercial air conditioning units, multi-split systems, and VRV systems. Its range includes several indoor unit types to suit different ceiling conditions and room layouts. For a VRV solution, the design team should check the combination of outdoor units, indoor units, and controllers against the system documentation. Each selected unit must be compatible with the connections allowed by the design configuration.

4.2. Mitsubishi Electric

Mitsubishi Electric offers the Mr. Slim commercial split system and the City Multi VRF system. Equipment connection requirements differ between these product groups. In offices with multiple separate rooms, the design team should check the ability to control each area and the compatibility of the selected indoor units.

4.3. Mitsubishi Heavy Industries

Mitsubishi Heavy Industries supplies residential and commercial air conditioning units, as well as VRF systems. It is a separate brand from Mitsubishi Electric, with its own product range, equipment codes, and technical documentation. Procurement documents should state the full brand name, model number, and configuration so the delivered equipment can be verified.

4.4. Panasonic

Panasonic’s commercial split systems include indoor units such as ceiling cassettes and ducted units. The NX Inverter R32 range offers different capacities and installation configurations. When comparing equipment, businesses should review the specifications for the exact outdoor and indoor unit combination. Integrated air treatment features should be assessed for each model.

4.5. LG

LG offers split systems, multi-split systems, and the MULTI V VRF system. For offices with multiple areas, the design team can consider the indoor unit configuration and control options available with MULTI V. Advanced control features should be checked against the controllers, sensors, and accessories included in the supply scope.

4.6. Toshiba

Toshiba offers commercial split systems and VRF systems. Its commercial range includes ceiling cassette, concealed ducted, and ceiling-suspended indoor units. When selecting equipment, businesses should confirm the model supplied in Vietnam, the equipment combination, and the relevant installation documentation.

4.7. Casper

Casper offers commercial air conditioning units such as ceiling cassettes and floor-standing units. When selecting equipment, businesses should check each model’s cooling capacity, power supply requirements, and installation dimensions. The quotation should specify accessories, installation work, and the warranty conditions applicable to commercial equipment.

5. Considerations for Planning Office Air Conditioning

During office design and construction, air conditioning locations should be coordinated with the floor plan and ceiling layout. Confirming the equipment early helps define service routes, installation clearances, and access points for maintenance.

5.1. Determine the Outdoor Unit Location or System Connection Point

For air-cooled outdoor units, the design team should check the air intake and discharge paths, as well as installation clearances, against the equipment documentation. The location should also account for noise, vibration, and maintenance access.

For systems that use the building’s infrastructure, the design team should identify connection points, available cooling capacity, and the adjustments the business is permitted to make. The building management team and design team should agree on connection conditions before construction drawings are prepared.

5.2. Plan Indoor Units, Supply Air Grilles, and Return Air Routes

The design team should coordinate supply and return air locations with partitions, occupant locations, and room shapes.

  • Check the airflow direction and distribution range at workstations.
  • Keep return air paths unobstructed and suitable for each room after partitions are installed.
  • Check doors, tall cabinets, and other obstructions that may affect airflow.

System airflow and distribution capacity determine the number of air grilles required. Any layout using multiple grilles should be supported by airflow calculations and balancing.

5.3. Coordinate Piping, Power Supply, and Condensate Drainage

Service routes should be determined based on the selected air conditioning system.

  • For systems that deliver refrigerant to indoor units, check the refrigerant piping routes.
  • For chilled water systems, check the supply and return pipes and connection points.
  • Show the power supply, control wiring, and condensate drain routes together in the project documents.

The design team should review the routes on the mechanical, electrical, and plumbing (MEP) drawings to identify clashes before construction. Insulation requirements and condensate drainage methods should follow the design and equipment instructions. For systems with condensate pumps, the drainage solution should suit the pump configuration.

5.4. Check Suspension Structure and Ceiling Void

Ceiling-mounted indoor units should be connected to the load-bearing structure using a suitable suspension system. The gypsum ceiling is a finishing layer. The design team should coordinate ceiling openings and framing with equipment locations.

The ceiling void should provide enough space for the unit, piping, insulation, and installation work. Required ceiling void height depends on the model, actual construction details, and maintenance requirements. The ceiling design should be checked before equipment is approved.

5.5. Coordinate Air Conditioning with the Fresh Air System

Most air conditioning units recirculate indoor air to control heat. The need to introduce outdoor air should be determined as part of the office ventilation and fresh air supply design.

Outdoor airflow and the approach to treating heat and humidity affect the system’s cooling load. Fresh air supply locations should be coordinated with the air conditioning supply and return locations to serve the intended areas.

5.6. Provide Access Panels and Maintenance Space

Access panels should be located where components requiring maintenance can be inspected and removed. For concealed units, access to filters, electrical boxes, and drainage components should be planned according to the unit’s construction. When setting access panel dimensions and working clearances, the design team should check the locations of lights, partitions, and furniture. Maintenance access should remain available after the office is complete.

6. Inspect the Air Conditioning System Before Handover

Before handover, the inspection team should compare the installed air conditioning system with the approved design, manufacturer documentation, and contract scope. Acceptance criteria should be agreed on before the inspection.

ItemInspection basisInformation to record
Equipment and installation locationsEquipment schedule and approved drawingsModel numbers, quantities, and actual locations
Suspension structure and accessSuspension details and installation instructionsEquipment security and working clearances
Piping, insulation, and condensate drainageDesign and equipment documentationTest results against the design and equipment documentation, signs of leaks, and condensate drainage performance
Power supply and controlsElectrical diagrams and equipment requirementsConnection and grounding status, and control operation
Air distribution in each areaCalculations and supply and return air layoutsMeasurements and air balancing results within the required scope
Test run and operating conditionTest procedure and agreed criteriaTest conditions, operating parameters, noise, and signs of abnormal operation
Handover documentsContract and document scheduleAs-built drawings, operating instructions, warranty documents, and related records

Office interior design documents provide a basis for checking the project scope and technical requirements. Inspection results should be recorded for each item. Any discrepancies found should be documented, resolved, and rechecked as required by the project.

See also: What Is a Defect List? How to Prepare and Manage Defects During Office Fit-out

Before approving an office air conditioning plan, businesses should compare the heat load with the capacity of the building infrastructure. The documents should clearly state cooling capacity, equipment configuration, and installation conditions to guide construction, inspection, and operation after handover.

7. Frequently Asked Questions About Office Air Conditioning

7.1. What Air Conditioning Capacity Does a 50 sqm Office Need?

A 50 sqm area alone is not enough to determine the required capacity. Ceiling height, sun exposure, glazing area, occupant numbers, equipment, and the outdoor air supply plan must also be considered. If the room has partitions, capacity and airflow distribution should be determined for each area.

7.2. Can a Separate Unit Be Installed If the Building Already Has Central Air Conditioning?

Whether an additional unit can be installed depends on building infrastructure and regulations. Businesses should confirm the outdoor unit location, power supply, piping routes, and condensate drainage with the building management team. The proposed addition should also be checked against the operating capacity of the existing system.

7.3. Does Adding a Meeting Room Require Adjustments to the Air Conditioning System?

The service area and supply and return air routes should be checked again after the space is divided. A meeting room may change the number of people gathered and the fresh air supply requirements. The inspection results will determine whether air grilles, controls, or equipment capacity need to be adjusted.

7.4. What Should Be Checked When Using the Office After Hours?

Businesses should confirm cooling hours, registration procedures, costs, and the areas served after hours. If an area is used regularly outside the building’s standard schedule, the business should assess whether separate operation or an additional solution approved by the building is possible.

7.5. How Often Should Office Air Conditioning Be Cleaned and Serviced?

Cleaning and maintenance schedules should follow the equipment documentation and account for operating hours and dust levels. Filters, heat exchangers, and drainage systems may need different inspection schedules. The facilities team should record actual equipment conditions and adjust the maintenance plan accordingly.

Author

MKT Team

Contact Maison Interior

Tell us about
your office project

Share your floor plan, expected team size and requirements to start a conversation with Maison Interior.